PROJECT EXPERIENCE
Apache Cryogenic Plant
APACHE CRYOGENIC PLANT
Client:
Apache / Altus Midstream
Location:
West Texas
Project Summary:
Opero Energy supplied three (3) 200 MMSCFD SRX cryogenic plants to Altus Midstream for their Diamond Cryo Complex in the Alpine High region of West Texas. Opero Energy’s scope of work included engineering, design, fabrication, testing of all three cryogenic plants, commissioning, start-up support and performance testing. Each cryogenic train included a molecular sieve dehydration system, propane refrigeration and inlet treating.
Project Overview:
- Three (3) 200 MMSCFD Cryogenic Plants
- 4,500 HP Refrigeration Systems Per Train
Scope of Work:
- FEED / Concept Selection
- Engineering
- Detailed Design
- Fabrication & Testing
- Commissioning Support
- Performance Testing